Orlicky´s material requirements planning
Material type:
TextLanguage: English Publisher: New York : McGraw Hill, 2011Edition: 3a. edDescription: xvii, 526 páginas : tablas; ImpresoContent type: - texto
- no mediado
- volumen
- 978-0-07-175563-4
- 658.7 P975
| Item type | Current library | Shelving location | Call number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Libro | Biblioteca Hernán Malo González | Biblioteca Central Bloque B | 658.7 P975 BG02350 (Browse shelf(Opens below)) | Available | BG02350 |
Browsing Biblioteca Hernán Malo González shelves, Shelving location: Biblioteca Central Bloque B Close shelf browser (Hides shelf browser)
|
|
|
|
|
|
|
||
| 658.7 A4731 BG01973 Soluciones logísticas: manual para optimizar la cadena de suministro | 658.7 C3484 BG01970 Logística comercial internacional | 658.7 M8271 BG01969 Logística de transporte y distribución de carga | 658.7 P975 BG02350 Orlicky´s material requirements planning | 658.7 S118 BG00457 La cadena de suminstro : modelos y herramientas de planificación y optimización de la cadena de suministro | 658.78 A536 BG00462 Logística integral : la gestión operativa de la empresa | 658.78 L387 BG18188 Manual del transporte en contenedor |
Incluye índice. Incluye apéndice
Contiene: Overview. MRP in the modern world. The four critical questions answered. Inventory in a manufacturing environment. Principles of materials requierements planning. The material requirements planning system. Processing logic. Lot sizing. System records and files. Managing with the MRP system. A new way of looking at things. Product definition. Master production schedule. More than an inventory control system. System effectiveness: a function of design and use. Industry effect on MRP. Project manufacturing. Remanufacturing. Process industry aplliction. Repetitive manufacturing application. Sales and operations planning, Looking backward and forward. Historical context. Blueprint for the future: demand-driven MRP logic. Strategic inventory positioning. Buffer profiles and level determination. Dynamic buffers. Demand-driven planning. Highly visible and collaborative execution. DDMRP future
There are no comments on this title.